Arizona's premier commercial solar EPC
Commercial solar, engineered, procured, and installed by a single licensed team
47 MW across 680 projects since 2008. Rooftop, ground-mount, carports, energy storage, and long-term O&M — all in-house.
Proven, licensed, and in business since 2008
47 MW
Installed across Arizona & California
680
Commercial projects completed
18
Years building solar in the desert
2
States licensed (AZ, CA)
25
Employees, all in-house
Certifications & Licenses
- NABCEP — NABCEP PV Installation Professional
- AZ ROC — Arizona ROC license (CR-11, KB-1)
- CA CSLB — California CSLB license #1076679
Anchor commercial clients
A few of the organizations we've built for.
Services
End-to-end commercial solar, under one roof.
Engineering, procurement, construction, and maintenance — handled in-house by a team that's been building commercial solar in Arizona since 2008.
Commercial Solar Installation
Rooftop, ground-mount, and behind-the-meter PV systems engineered for commercial loads.
Learn More
Solar Carports
Parking-lot canopies that generate power and add shade — purpose-built for AZ heat.
Learn More
Energy Storage (BESS)
Commercial-grade battery storage paired with solar for demand-charge management and resilience.
Learn More
EV Charging
Level 2 and DC fast charging integrated with on-site solar and storage.
Learn More
Operations & Maintenance
Long-term O&M and routine commercial solar maintenance to keep production at spec.
Learn More
Solar Financing
PPA, SSA, lease, loan, and prepaid options — structured to fit your balance sheet.
Learn More
Our process
From first call to ongoing O&M, six steps.
The same SunRenu team carries you through every step — no handoffs, no surprises.
Consultation
We meet to understand your loads, roof, site, and financial goals.
Site Evaluation
Structural, electrical, and shading analysis on-site by professionals.
Design
Custom PV system design with stamped drawings, modeled production, and ROI.
Install
In-house crews handle EPC end-to-end — no subcontractor handoffs.
Activation
Utility interconnection, commissioning, and final inspection.
O&M
Ongoing monitoring, cleaning, and maintenance to protect your investment.
Recent installations
A small slice of 680 projects since 2008.
From Tucson schools to Phoenix churches to Eloy City Hall — rooftop, carport, and ground-mount systems built by the same SunRenu team you'd work with.
1.20 MW Rooftop
Dream City Church
Phoenix, AZ
942 kW Carports
Desert View High School
Tucson, AZ
725 kW Carports
Phoenix Suns/Mercury HQ
Phoenix, AZ
483 kW Rooftop
Stovepipe Wells — National Park Service
Death Valley, CA
2.23 MW Carports
Coyote Valley Band of Pomo Indians
Redwood Valley, CA
310 kW Rooftop
Palm Valley Church
Goodyear, AZ
From the clients
What the people who hired us said afterward.
Building owners, churches, and schools across Arizona and California — in their own words.
SunRenu handled every step — engineering, permitting, the install, and the utility paperwork. We never had to coordinate between subs because there were no subs. The system has produced above spec since day one.
Norm
Building Owner · Las Ramblas Viejo
The financing structure they walked us through made the difference. As a tax-exempt entity we couldn't use the federal credit directly, so an SSA was the obvious route. Below-utility rates from month one.
Executive Director
Palm Valley Church
We were referred to SunRenu after a different installer went out of business. SunRenu cleaned it, re-commissioned it, and now we have monthly production as originally expected.
Facilities Director
Scottsdale Christian Academy
Frequently asked
The questions every commercial buyer asks us first.
-
What size commercial projects do you build?
We've installed systems from 13 kW (small church) to 8 MW (school districts, large industrial) and everything in between. The economic sweet spot for SunRenu's process is typically 100 kW and up, but we'll take an honest look at any commercial project — including portfolios of smaller sites. -
Do you do residential solar?
No. We specialize exclusively in commercial — including non-profits, churches, municipalities, and corporate facilities. Residential solar is a different operations model and we don't pretend otherwise. -
How long does a typical commercial install take?
From signed contract to active production, expect 4–8 months on average. Engineering and permitting take 2–4 months; install itself is 4–10 weeks depending on size and complexity; utility interconnection adds a tail of weeks. Larger projects (1 MW+) trend longer. We build a real schedule into our proposal so you can sequence around it. -
Can a non-profit or school benefit if we don't pay federal tax?
Yes. Tax-exempt entities use Solar Services Agreements (SSAs) — a third party owns the system, captures the federal investment tax credit, and sells you the power at a below-utility rate. Zero capital outlay, immediate energy savings. We work with multiple SSA partners and shop the proposal. -
What happens after the install — do you maintain the system?
Yes. SunRenu's Operations & Maintenance program covers monitoring, periodic cleaning, electrical inspections, and rapid-response repairs. We can take over O&M on systems we didn't install too — onboarding starts with a baseline thermal scan and documentation audit. -
Where do you operate?
We are headquartered in Arizona and licensed in both AZ (ROC) and CA (CSLB #1076679). We have crews based in Phoenix, Tucson, and across Southern and Northern California. For projects outside AZ and CA, reach out — we evaluate every request.
Service Territory
Licensed across Arizona and California.
SunRenu is bonded and licensed in both states. Arizona is headquarters — we have crews based in Phoenix, Tucson, and across Southern and Northern California. SunRenu has installed across Maricopa, Pima, Pinal, Coconino, and Yavapai counties, as well as Los Angeles, Orange, and San Diego counties, to name a few.
Arizona — ROC
CR-11, KB-1
California — CSLB
#1076679
Ready to model your commercial solar project?
Tell us about your facility, your loads, and your timeline. SunRenu responds within one business day.